Data Centers​

With servers in USA (Cyxtera), Europe (Neterra), and Hong Kong (Centurylink), we provide our clients with a wide range of options to ensure their requirements for connectivity and performance are met with excellence.

Cyxtera / USA​​

PHYSICAL LOCATION

  • Located near Logan International Airport
  • 30 minutes from Boston, MA
  • Total building interior (sf) = 165,968
  • Raised floor (inches) = 24

POWER SUMMARY

  • NSTAR provides power feeds
  • Power density minimum (W/sf) = 150
  • Generator configuration = N + 1
  • Total Power Capacity = 6 MW
  • Minimum two fuel replenishing companies

CONNECTIVITY

  • Connectivity to 6 unique network service providers and growing community of service providers
  • Copper & fiber optic cross connects
  • Dual diverse fiber entrance facilities
  • Carrier neutral interconnection area

CenturyLink / Hong Kong

PHYSICAL LOCATION

  • Located at Tsueng Kwan O Industrial Estate 49 km from Hong Kong airport
  • Five story building
  • Total building interior (sf) = 200,000
  • Raised floor (mm) = 800

POWER SUMMARY

  • China Lighting and Power (CLP) provides power feeds
  • Power density minimum (Wm2) = 1500
  • Generator configuration = N + 1
  • Total Power Capacity = 5.76 MW phase one, total 14.4 MW
  • Minimum two fuel replenishing companies

CONNECTIVITY

  • Supports ultra-low latency colocation and proximity hosting
  • Rapid cross connects with Tokyo and Singapore financial markets.

Neterra / Europe​

PHYSICAL LOCATION

  • Two-floor colocation facility with a total area of 660 m2
  • Floor height 3.50 m plus 50 cm. raised floor
  • Floor loading 3 kN

POWER SUMMARY

  • Two independent sources of electric power supply, each of them able to cover 100% of the load.
  • 1+1 electric generators, switching automatically
  • Two fully independent А UPS (N+1) and В UPS (N+1) systems

CONNECTIVITY

  • Neterra is a part of the largest Internet exchange points in Europe: DE-CIX in Frankfurt, Equinix in Paris, LINX in London, AMS-IX in Amsterdam, and Ronix and Interlan in Bucharest.
  • Direct connectivity to all neighboring countries and reaches Georgia and Armenia via the Black Sea, and Asia and Africa via the submarine cable systems MedNautilus and SEE-ME-WE 3.